SAMPLE · EST-0001 · v1 · Priya Natarajan
Front walkway beds
Clear and rebuild the front walkway beds with amended soil, low-water perennials, steel edging, and mulch.
Shrub removal and bed regradinglabor
$450.00
Soil amendmentmaterials
$186.00
Perennialsmaterials
Needs price
Steel edging, installedlabor
$570.00
Mulch, installedmaterials
$272.00
Mini excavator rentalequipment
$325.00
- Subtotal
- $1,803.00
- Tax 7% on taxable items
- $32.06
- Total
- $1,835.06
How this total is calculated
- Subtotal: sum of priced line items = $1,803.00.
- Tax: 7% (rate you entered) × taxable amount $458.00 = $32.06.
- Total: $1,803.00 - $0.00 + $32.06 = $1,835.06.
Needs clarification
- Plant list, quantities, and sizes.